THE WORK, EXPLAINED
Start with the condition.
Understand the scope.
Identify the required door arrangement and confirm which leaf will normally operate. Ask the provider to specify the frame, threshold, meeting-edge hardware and lockset, together with the removal and finishing scope. Have the proposal explain how alignment and the operation of both leaves will be checked and how additional opening repairs would be handled.
What may be involved
- prehung French door pair
- astragal
- hinges
- flush bolts
- lockset
- threshold
- flashing
- casing
Ask the provider to distinguish existing parts to inspect, proposed replacements, and tools, materials or reports included in the service. Confirm the work and exclusions after assessment; this list does not mean that every item will be supplied or replaced.
LOCAL RESEARCH / Chinatown
Building history
The area rebuilt on its original site after 1906, and some buildings reused original brick; its historic fabric includes many early post-earthquake structures.
Source ↗Housing context
The Chinatown Area Plan describes predominantly low, small-scale buildings, with many buildings relatively short in depth because of the lot pattern. This describes the district’s built form, not the equipment or condition of an individual property.
Source ↗Local exposure
The City identifies Chinatown as comparatively sunny and sheltered from wind, rather than treating it as a typical fog-exposed district.
Source ↗Local context
The plan records more than 250 historically or architecturally important early post-earthquake buildings, so preservation-sensitive work is a realistic consideration.
Source ↗Planning your work
San Francisco's Department of Building Inspection publishes step-by-step instructions for over-the-counter permits covering doors, windows, reroofing and other common exterior residential projects. The page lists in-kind window replacement and in-kind exterior door replacement, at the same size and location, among the projects eligible for over-the-counter review through the PermitSF portal, and separately says that new windows or exterior doors in new locations are among the projects that need plans. Read it before agreeing a scope, and confirm the address, the opening and the review route with the department. It does not decide eligibility, timing or requirements for an individual property.
Source ↗Area-wide context does not establish the condition of your property or equipment.
Before the visit
Identify the affected opening and describe the symptom. Gather available product labels and previous work records. Explain access restrictions and keep the opening clear.
Service illustration · not a completed customer project

